Construction
Concrete Estimator - Tube
Concrete to fill a round tube form.
Did this calculator solve your problem today?
✓ Thank you for your feedback!
Report issue to loopingon.com
Sponsored
Estimate concrete to fill round tube forms for footings and piers.
The math behind it
Each tube is a cylinder: π × radius² × height; multiply by the number of tubes.
Worked Example
Four 10 in × 3 ft tubes → 6.5 ft³.
Frequently Asked Questions
60 vs 80 lb bags?
A 60 lb bag yields ~0.45 ft³; an 80 lb bag ~0.6 ft³.
Advertisement